Home Page Previous Home Next

TyneBridge

Tyne Bridge

This bridge was opened in 1928 at which stage it was the largest single span in the world linking Newcastle with Gateshead. It cost £700,000 to build — the recent refurbishment cost £1.8 million. The towers are faced with granite. They were originally intended to be used as 5 story warehouses but the flooring was never completed.